In summer 2026 Nesta worked as part of a joint team with officials from the Department for Energy Security and Net Zero (DESNZ) on a two-month policy sprint focused on accelerating electrification in the UK. This was framed by the developing energy crisis brought on by the Iran war and the publication of the UK government’s Warm Homes Plan earlier in the year which set out the strategy for lowering bills and decarbonising UK homes through electrification.
We found the sprint to be a useful exercise in collaboration, rapid testing and evaluation, something we think there’s space to do more of across government. This is especially true as the UK government signals its desire to devolve more delivery responsibilities to local authorities, which will require effective testing and learning through piloting and partnerships between central and local government. Innovative practices like policy sprints and test-and-learn are key to helping government deliver policies quickly and adapt as they learn.
At Nesta we use deep expertise in a wide range of innovation methods to tackle complex challenges like reducing carbon emissions from the UK’s homes. In this sprint we worked with DESNZ as a joint team, bringing this experience to support officials with analytical expertise, domain knowledge and innovative methods to test new ideas.
The sprint was tasked with identifying the short-term policy actions that could be taken now to accelerate the goals of the Warm Homes Plan, and new and innovative policy proposals that could make a difference by the end of 2026.
The following is a summary of what we learned about the process and how it should be used to tackle new challenges in home decarbonisation and beyond.
Sprints are a short, focused way of working that organises a team around a clear challenge. It sets out a problem and the sprint challenges the team to go through a process of rapid analysis, experimentation and decision making to come back with answers. It’s not expected that everything is solved, but that key hypotheses have been tested and there is confidence in moving forward with further development or dropping ideas.
The sprint method is popular in design innovation and used widely in digital and product development contexts, with the most famous being the Google Design Sprint model typically used over one week to go from a broad problem to validated solution. We use this approach at Nesta on a wide range of challenges, typically as a speed testing model over our weeks.
In public policy it has been adopted in various ways. Over the past decade innovation teams such as Policy Lab have pioneered its use in UK government policy making and internationally it has been used as widely as New Zealand and Canada to focus teams on problems that need solving in a short timeframe.
What makes it good for policy work and why it can cut through difficult challenges is because of how it’s structured and what this enables teams to do differently. At its heart it’s about setting a really clear problem, a deadline and milestones, freedom to get the right people in the room, and empowering and challenging the team to come up with the answers. The energy emergency following the war in Iran in this case created the permission, senior attention and urgency that made the sprint work.
This deliberately differs from a ‘traditional’ policymaking process where a team might prioritise more rigorous evidence, taking more time to consider the impacts and interactions, and often work around a narrower issue.
Sprints require a rapid cycle of inquiring, testing, learning and decision making. Their goal is to learn enough to make a decision and move forwards within the time available, which requires feedback and direction to be provided rapidly.
The traditional approach of ministerial upwards advice is a challenge in a short process like this and different types of engagement may be needed such as in-person discussion, demos and delegation of decision making to stop feedback being a blocker to progress. We learnt that this also requires a shift towards greater ownership of issues by civil servants themselves, while enabling most important decisions and direction to be provided by ministers.
Working rapidly requires novel approaches and different standards of evidence to more traditional in-depth and rigorous policymaking. We found that sprint-based working should embrace the use of AI tools, rapid external engagement to generate and stress-test ideas (sometimes called red-teaming) and making judgement on the best available evidence.
Within policy this obviously requires a very careful balance between working rapidly and ensuring there are still standards in the way evidence is gathered and assessed, particularly being aware of bias in who is being consulted with and how AI may shape thinking.
In our sprint we found that the rapid timelines could sometimes push our team towards what it controls, such as the schemes already run by the department and the rules it has the immediate ability to change.
While it is important to accept there might not be a big bang breakthrough in this time, it’s also equally important to encourage ambitious big ideas. To do this, we found it useful to keep both a list of what can change now and the bigger shifts the sprint surfaced but couldn't resolve quickly, and discuss the trade-offs between these.
Sprints work best when everyone is working as one team, drawing in expertise and challenge from across the government on the problem at hand. Our sprint benefited from having a senior sponsor with the ability to convene the right people and push for further answers, and it’s important to make the most of this.
But beyond subject matter experts we found it was also important to have people involved who can assess delivery challenges as much as technical policy questions, so that the team can assess ideas across different dimensions, like feasibility, technical deliverability and unintended consequences. This is especially important for more public-facing solutions and public services where delivery expertise and understanding of users is crucial to making policies work.
For a rapid sprint, the team needs a simple and effective framework to work within that provides regular touchpoints and alignment. Agreeing the key rituals, expectations, reporting formats and communication channels and having someone responsible for these is key. But similarly you don’t want to create a process driven machine where the outputs and meetings outweigh progress. In civil service policymaking especially, sprints require a balance between the formats and outputs that the organisation is used to - whether presentations, advice or data - and what’s most useful to actually answer questions.
Based on our experience with this sprint, some types of challenge may be more suitable to this type of working than others.
Good challenges to address through a policy sprint are likely to have:
A policy sprint is harder to make work where:
Looking ahead, we think there’s a strong case for using sprints more widely across government, particularly where ministers or mayors are setting fresh priorities. In DESNZ for example, good candidates include the design of future schemes, setting up the new institutions needed to deliver them, and launching consumer-facing offers that have to work for households from day one.
We think that sprints should also be viewed as the ‘front end’ of test and learn approaches or live pilots rather than an end in themselves: they generate, filter and prioritise options that place-based programmes can then trial and scale, as our work with local authorities has shown. To make this routine rather than exceptional, government could build a small sprint capability that departments can call on, standardise the framework and coaching, and help senior officials frame briefs and spot the challenges that suit sprint working.