Our Work

Image of child in room lit by candlelight

The UNDP Renewable Energy Challenge

Can you make a difference in the lives of people affected by war?  

The United Nations Development Programme (UNDP) in Bosnia and Herzegovina is now issuing a challenge to find a renewable energy solution capable of providing off-grid power to cover the needs of an average war-returnee family in rural Bosnia and Herzegovina.

Challenge description
Timeline
Entry criteria
Judging criteria
Enter the challenge

Since the end of the war in Bosnia and Herzegovina in 1995, more than one million out of 2.2 million persons displaced during the war have returned to reclaim their lives.

For most of them, houses have been reconstructed and normal living conditions restored, but still more than 3,000 families in the most remote rural areas lack access to power. With the fast-declining funding for returnees, there is little hope that the grid will be extended to their villages; in most cases such an investment is not even economically justified.

Life without electricity

In 1995, 78-year old Milos Bosnjak's family - his son and daughter in law, with two grandsons - fled their homes and the carnage of war. While their house has been reconstructed, they still have no access to electricity. They cannot refrigerate their food or illuminate their home. They feel completely disconnected from the rest of the world.

They own a cow, one calf and 163 sheep. But without electricity they cannot store and refrigerate milk, nor produce cheese to generate income. Milos' grandson, who is a big football fan, can't watch TV at home. He already dreams of living in the city, where he can watch his favourite champions league teams.

Challenge description

Design and develop a sustainable, cost-effective solution for a standalone, off-grid renewable energy supply that can produce an average of 2,25 kWh and 120 litres of hot-water a day, to cover the needs of an average returnee family in rural areas of Bosnia and Herzegovina that will not cost more than €5.000.

Read the detailed description of the challenge

The winner will receive a $20,000 cash prize. In addition, UNDP in Bosnia and Herzegovina will pilot the winning solution in a rural area for up to 50 returnee families in 2013. 

Furthermore the winning solution might be replicated in other parts of the world to produce off-grid renewable energy for refugees and returnees. The market potential for the challenge prize winner is significant.

Timeline 

Deadline for entry: 12pm, Wednesday 1 May, 2013

Contact short-listed: 12pm, Friday 31 May 2013

Confirmation of the winner: Summer 2013

Entry criteria

The challenge is open to anyone (18+ age) who can engineer a complete solution, produce it in sufficient quantities and deliver it within the expected timelines  

The full requirements are described in a more detailed description of the challenge.

Judging criteria

  • Cost of the solution (all costs including manufacturing, delivering and installation of the system)
  • To what extent does the energy produced meet the estimated needs of the average beneficiary family
  • Average running costs for the end user
  • Estimated maintenance costs for the end user
  • Simplicity of installation, maintenance and usage; replication potential
  • The quality of the instruction manual provided to the end user
  • Potential for cost saving if applied as a community-based solution 

Arrow icon green [original]ENTER THE CHALLENGE


If you have a question about the challenge prize you can get in touch by emailing undp.prize@nesta.org.uk

Centre for Challenge Prizes logo

UNDP logo